BRADLEY AND HEMLOCK PUMP STATION PIPING MODIFICATIONS

The Town of Branford, Connecticut, hereby gives notice that sealed Bids will be received for the Bradley and Hemlock Pump Station Piping Modifications. The work at the Bradley Pump Station includes, but is not limited to, the replacement of approximately 30 LF of 8-inch cast iron force main with ductile iron pipe and fittings from inside the pumping station to an area outside the pump station. A sewage surge relief valve, gate valves, and piping will be installed at the Hemlock Pumping Station.

The Work under the proposed Contract shall commence within 60 days after the date set forth in the Notice to Proceed and shall be completed within 195 days after start of Work.

The Purchasing Clerk for the Town of Branford, Connecticut will receive sealed bids until 11:00 a.m. Local Time on November 21, 2019, at the Finance Office, Town Hall, 1019 Main Street, Branford Connecticut 06405, at which time they will be publicly opened and read aloud.

Plans and specifications for this project will be available for download at the Town of Branford website and at the CT DAS website. A printed set of plans and specifications are available for review during business hours after October 29, 2019, at the Town Hall Engineer’s Office 1019 Main Street Branford, CT 06405.

No Bid shall be withdrawn for a period of 90 days after the opening of Bids without consent of Owner.

The Owner reserves the right to reject any and all Bids, waive informalities or minor defects in bidding or to accept the Bid or Bids, which best serve the interests of Owner.

File/Document